HomeAboutContact

Residential Construction Project Bill of Materials - 1

By Daniel Sobrado
Published in Other
November 30, 2024
1 min read
Residential Construction Project Bill of Materials - 1

Residential Construction in Nueva Ecija - Project Bill of Materials by Randy Yerro

I’ve found this video by Randy Yerro and I decided to have a look at the costs as a reference.

Location: Nueva Ecija, Philippines Total Project Cost: PHP 1,520,633 (USD 30,412) Building Area: 150 sqm (15m x 10m) Lot Area: 430 sqm

Project Overview

  • Construction Start: January 18 - 2024
  • Building Features:
    • 3 Bedrooms
    • 2 Toilet and Bath
    • 1 Laundry Room
    • Living Room
    • Dining Area
    • Kitchen
    • Garage

1. Foundation and Structural Materials

Reinforcing Steel

ItemQuantityPrice/Unit (PHP)Total (PHP)
12mm Rebar90 pcs18816,920
10mm Rebar700 pcs13091,000
Tie Wire #1692 kg605,520

Concrete Materials

ItemQuantityPrice/Unit (PHP)Total (PHP)
Holcim Cement350 sacks23080,500
Sand (Buhangin)45 loads1,40063,000
Mixed Sand25 loads1,30032,000
Hollow Block D5900 pcs1210,800
Hollow Block D44,100 pcs1041,000

Formwork Materials

ItemQuantityPrice/Unit (PHP)Total (PHP)
Coco Lumber 2x2x1280 pcs1008,000
Coco Lumber 2x4x1250 pcs20010,000
Marine Plywood 1/2”10 pcs6506,500
Nails (Pako)40 kg602,400

2. Plumbing and Electrical

Plumbing Materials

ItemQuantityPrice/Unit (PHP)Total (PHP)
Orange Pipe #48 pcs3002,400
Orange Pipe #212 pcs1501,800
Orange Elbow #48 pcs75600
Orange T Connection 4x22 pcs85170
Orange Y Connection 4x41 pc8585
Orange Elbow #212 pcs25300
Clean Out #42 pcs85170
Blue PVC Pipe 1/2”12 pcs60720
G.I. Elbow 1/2”17 pcs30510
G.I. Connector 1/2”10 pcs30300
Solvent Cement2 L380760
Teflon Tape10 pcs15150

3. Roofing Structure

Steel Trusses

ItemQuantityPrice/Unit (PHP)Total (PHP)
Angle Bar 1/4×2 Green44 pcs68029,920
Angle Bar 1/4×1 1/2 Green40 pcs52020,800
Angle Bar 3/16×2 Yellow115 pcs58066,700
C Purlins 2/7×1.517 pcs93015,810
Welding Rod Special40 kg1355,400

Painting Materials

ItemQuantityPrice/Unit (PHP)Total (PHP)
Epoxy Primer Gray12 gal6506,720
Lacquer Thinner4 gal200800
Paint Brush6 pcs1590
Baby Roller8 pcs50400
Paint Tray4 pcs35140
Cutting Disk #147 pcs2001,400

4. Finishing Materials

Doors and Windows

ItemQuantityPrice/Unit (PHP)Total (PHP)
Analok Windows13 pcs-45,000
Panel Door5 pcs4,00020,000
Hamba5 pcs1,8009,000
CR Door3 pcs3,0009,000
CR Bowl2 pcs3,5007,000
Door Knob Lock5 pcs6503,250
Deadbolt Lock2 pcs5501,100

Cost Summary

  1. Structural Phase

    • Materials: PHP 375,605
    • Labor: PHP 150,242
    • Subtotal: PHP 525,847
  2. Steel Trusses

    • Materials: PHP 148,180
    • Labor: PHP 59,272
    • Subtotal: PHP 207,452
  3. Roofing (Tiles Pan Color Gray and Spandrel)

    • Materials and Installation: PHP 178,114
  4. Finishing Phase

    • Windows and Doors: PHP 115,350
    • Labor: PHP 18,870
    • Additional Finishing Materials: PHP 75,000
    • Additional Labor: PHP 70,000
    • Subtotal: PHP 279,220

Total Project Costs

  • Building Construction Cost: PHP 1,190,633 (USD 23,812)
  • Lot Cost (430 sqm): PHP 330,000
  • Total House and Lot Cost: PHP 1,520,633 (USD 30,412)

Tags

#bom#cost

Share

Previous Article
Roof and Balcony Coatings
Daniel Sobrado

Daniel Sobrado

I build stuff

Table Of Contents

1
Residential Construction in Nueva Ecija - Project Bill of Materials by Randy Yerro
2
Project Overview
3
1. Foundation and Structural Materials
4
2. Plumbing and Electrical
5
3. Roofing Structure
6
4. Finishing Materials
7
Cost Summary

Related Posts

Use AI to calculate your BOM
December 01, 2024
2 min

Quick Links

PublishAbout UsContact Me

Social Media